• T: 02 9586 4401
  • E: admin@archi-qs.com.au
  • Home
  • About Us
  • Quantity Surveying
    • Bank Reports
    • Cost Planning
    • Council Cost Reports
    • Embodied Emissions Reporting
    • Estimated Development Cost (EDC) and Employment Estimates
    • Gross Floor Area Validation Reports
    • Initial Maintenance Schedules
    • Planning Portal Management
  • Strata Services
    • Asbestos Register and Management Plans
    • Capital Works Plans
    • Child Safety Lock Audit
    • Dilapidation Reports
    • Insurance Valuations
    • Safety Reports
    • Self-Managed Strata Schemes NSW
    • Shared Facilities Services
  • SBBIS
  • Tax Depreciation
    • What is Tax Depreciation
    • Case Studies
    • FAQ
    • Apply Now
  • Design Practitioner
  • Portfolio
  • Insights & News
  • Contact Us

Introduction to Stage 4 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Aug 11, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 4 of the Strata Building Bond and Inspections Scheme is the rectification of the defects identified in Stage 3: Interim inspection and report. The developer is responsible to rectify the defects identified in the Interim Report, who will liaise with the builder....

The Design and Building Practitioners Act 2020 and Class 2 Buildings

by Archi-QS | Aug 4, 2021 | All Posts, Architecture, Project Management, Quantity Surveying, Updates, Insights & Thoughts

What types of projects does the The Design and Building Practitioners Act 2020 (DBP) Act apply to? The DBP Act applies to class 2 buildings or buildings that contain a class 2 component. Under the Building Code of Australia (BCA), Class 2 is classified as a multi-unit...

Introduction to Stage 3 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Jul 22, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 3 of the Strata Building Bond and Inspections Scheme involves the interim inspection carried out by the appointed building inspector and a report documenting the defects findings of the inspection. This report must be completed within 15 to 18 months of the date...

Introduction to Stage 2 of the Strata Building Bond and Inspections Scheme

by Archi-QS | Jul 22, 2021 | All Posts, Quantity Surveying, Strata Building Bond and Inspection Scheme, Updates, Insights & Thoughts

Stage 2 of the Strata Building Bond and Inspections Scheme calls for the developer to appoint a building inspector within 12 months of the issue of an Occupation Certificate (OC). The OC allows people to occupy the building and deems the project practically complete....

The Design and Building Practitioners Act 2020 (DBP) Act Key Takeaways

by Archi-QS | Jun 30, 2021 | All Posts, Architecture, Project Management, Quantity Surveying, Updates, Insights & Thoughts

What is the DBP? The Design and Building Practitioners Act 2020 (DBP) Act regulates design and building work in NSW by imposing certain obligations on Design, Building and Engineering Practitioners. The DBP Act covers class 2 buildings and buildings that include a...

The Value of Australian Standards Key Takeaways

by Archi-QS | Jun 30, 2021 | All Posts, Architecture, Project Management, Quantity Surveying, Updates, Insights & Thoughts

What are They? Standards Australia is the country’s leading independent, non-government, not-for-profit standards organisation. Australian Standards (AS) establish a common language to define quality and safety. In a nutshell, a standard is an industry-backed solution...
« Older Entries
Next Entries »

Recent Posts

  • Design-Led Density: NSW’s Pattern Book Signals New Planning Priorities
  • Navigating Shared Facilities: Essential Tools for Success
  • NSW Housing Boost: Key Reforms Unveiled
  • 5 Signs It’s Time to Update Your Tax Depreciation Report
  • Renovate to Save: Unlocking Tax Deductions with Property Upgrades

Categories

  • All Posts
  • Architecture
  • Council Cost Reports
  • Insurance Valuations
  • Project Management
  • Quantity Surveying
  • Strata Building Bond and Inspection Scheme
  • Strata Services
  • Tax Depreciation
  • Updates, Insights & Thoughts

Nominated Architect
Sarah Bozionelos No.10024

HEAD OFFICE

Unit 2 / 691
New South Head Road
Rose Bay NSW 2029
(02) 9586 4401
admin@archi-qs.com.au

QUICK LINKS

About Us
Building Consultancy + Cost Planning
Design Practitioner
Financier Quantity Surveying
SBBIS
Strata Services
Tax Depreciation
Insights & News

PROFESSIONAL AFFILIATIONS

Australian Institute of Architects (AIA)
Architects Registration Board (ARB)
Australian Institute of Quantity Surveyors (AIQS)
The Australian Society of Building Consultants (ASBC)
Design and Building Practitioners Act 2020
Tax Practitioners Board (TPB)
AIQS Strata Defect Rectification Costs Panel
AIQS Strata Building Inspection Cost Panel
ASBC Strata Building Defect Inspection Panel
AIQS Expert Witness Panel
AlertForce Assessment Asbestos and Removal Inspectors
Elmo Accredited Occupational Health and Safety Inspectors
Urban Development Institute of Australia (UDIA)